Cameron
Ram hang-off subassembly for Cameron
This ram hang-off subassembly is designed for use in Cameron well control systems. It provides a secure anchor point for blowout preventer components or drill pipe during operations.
Specifications
- Part number
- 2163090-03-06
- Brand
- Cameron
The ram hang-off subassembly, part number 2163090-03-06, serves as a specialized component within oil and gas well control systems. Its function is to provide a structural support and anchoring point for blowout preventer (BOP) assemblies or drill pipe strings within the wellbore. This component facilitates the suspension of equipment and assists in the management of pressures during drilling and completion activities.
This subassembly is engineered for integration into Cameron well control equipment. The component is identified by the 18-3 designation, which relates to specific dimensional or load capacity parameters relevant to the assembly. Cameron is the actual manufacturer of this equipment. The subassembly is designed to interface with existing well control infrastructure to maintain the mechanical integrity of the system during field operations.
In well control systems, a ram hang-off subassembly acts as the interface that transfers the weight of the drill string or casing to the BOP stack or wellhead. This allows for the secure suspension of heavy loads while maintaining pressure containment capabilities. Proper installation ensures that axial loads are distributed effectively across the housing assembly.

