Skip to content
Worldwide shipping

Harnischfeger

Mainline festoon system for Harnischfeger TW-21

P/N 29A9405

This mainline festoon system manages electrical cables and control signals for bridge crane components. It is designed for use with the Harnischfeger TW-21 model.

Specifications

Part number
29A9405
Brand
Harnischfeger

The mainline festoon system, part number 29A9405, provides cable management for bridge cranes and similar industrial machinery. It supports and guides electrical cables and control lines as they move along the main crane girder, ensuring that power and signals reach mobile components such as hoists, winches, and elevators without tangling or mechanical stress. The system utilizes a series of festoon trolleys that travel along a track or tensioned cable to maintain organized cable loops during crane operation.

This component is specifically engineered for the Harnischfeger TW-21 crane model (CGX/30293). It functions as the primary interface for mobile power delivery, allowing the crane to maintain continuous electrical connectivity across its full range of travel. By securing the cabling, the system prevents cable damage caused by excessive bending or snagging during the movement of the bridge crane trolley.

Festoon systems are standard in heavy lifting equipment to facilitate the safe transmission of electricity to moving parts. They allow for the expansion and contraction of cable loops, which is necessary for the linear motion required by bridge cranes and similar overhead lifting systems.